PROCESS PIPING FABRICATION AND INSTALLATION WORKS FOR THE OSMAN GAZI FPU – SAKARYA GAS FIELD DEVELOPMENT

Project Name

01

Location

FILYOS PORT, ZONGULDAK, TURKIYE

02

Status

ONGOING

03

Date

2026

02

Scope

THE FABRICATION AND ONBOARD INSTALLATION OF PROCESS PIPING SYSTEMS FOR THE OSMAN GAZI FPU, WHICH WILL SERVE THE SAKARYA GAS FIELD IN THE TURKISH BLACK SEA, ARE IN PROGRESS

04

Service

FABRICATION OF 90,000 WDI CARBON STEEL (CS) AND 20,000 WDI STAINLESS STEEL (SS), P11 ALLOY STEEL, COPPER-NICKEL (CuNi) AND COPPER PROCESS PIPING, INCLUDING PURE COPPER BRAZING; PAINTING, ACID CLEANING (PICKLING), ONBOARD INSTALLATION, NDT, HYDROSTATIC TESTING AND REINSTATEMENT WORKS