EPC STORAGE TANK FARM PROJECT FOR THE 750 MW NAINAWA POWER PLANT

Project Name

01

Location

IRAQ

03

Date

2013

05

Service

FABRICATION / INSTALLATION

06

Duration

20 MONTHS

02

Status

COMPLETED

04

Scope

RAW CRUDE OIL TANKS, LDO STORAGE TANKS, TREATED CRUDE OIL TANKS, CERTIFIED CRUDE OIL TANKS, RAW WATER TANKS, FIRE WATER TANKS, DEMIN WATER TANKS, STORAGE TANKS (TOTAL CAPACITY: 95,000 CBM)