ANTALYA AKSA ENERGY POWER PLANT
Project Name
Location
TURKEY
Date
2010
Duration
3 MONTHS
Scope
3000 M³ RAW WATER TANK ENGINEERING, FABRICATION, ERECTION
Service
FABRICATION / INSTALLATION
SAMSUN AKSA ENERGY POWER PLANT
Project Name
Location
TURKEY
Date
2010
Duration
4 MONTHS
Scope
3000 M3 RAW WATER TANK ENGINEERING
LO SERVICE TANK
20 M3 LO SERVICE TANK
Service
FABRICATION / INSTALLATION