NAINAWA 750MW POWER PLANT
Project Name
Location
IRAQ
Date
2013
Service
FABRICATION / INSTALLATION
Scope
RAW CRUDE OIL TANKS, LDO STORAGE TANKS, TREATED CRUDE OIL TANKS, CERTIFIED CRUDE OIL TANKS, RAW WATER TANKS, FIRE WATER TANKS, DEMIN WATER TANKS, STORAGE TANKS (TOTAL CAPACITY: 95,000 CBM)
Duration
20 MONTHS