2009

Company Startup

Deha Tech has founded by two close friends Mr. Berk Dal and Mr. Hakan Yıldırım. The Company motto ''Genius Solutions'' is to meet tomorrow's market from now on with tailored solutions.

2009

Company Startup

2010 - 2011

Our First HEPP and Factory Construction

Deha Tech's first Garzan Hydroelectric Power Plant and Areva Factory Construction projects has been successfully delivered to its clients as Turnkey Projects.

2010 - 2011

Our First HEPP and Factory Construction

2011 - 2012

We Fabricated Flue-Gas Desulfurization (FGD) in Cyprus Power Plant

Flue-Gas Desulfurization (FGD), De-Sox Tower & Pump station, 13.5 m3 / 12 Bar steam drum Energy Power Plant fabricated and installed in Cyprus.

2011 - 2012

We Fabricated Flue-Gas Desulfurization (FGD) in Cyprus Power Plant

2012 - 2013

Increasing our experience of EPC in CCPP Project

Our experience of EPC increasing in 900 MW Erzin Combined Cycle Power Plant Project. Storage Tanks API650 EPC, Turnkey Project: Engineering, Fabrication, Erection, Tank inner piping works of 7 units of Field erected storage tanks.

2012 - 2013

Increasing our experience of EPC in CCPP Project

2013 - 2014

ACC Structural Steel for Energy from Waste Plant in Plymouth, Hagen and Bamberg

Deha Tech fabricated a good solution for Plymouth, MVV Environment c/o Devon Port EfW CHP Facility Devon, MVA Hagen EfW 17 MWe and MHKW Bamberg EfW 11,3 MWe in ACC Structural Steel. We are saving resources and reducing the carbon footprint of Plymouth, Bamberg and Hagen Energy from Waste.

2013 - 2014

ACC Structural Steel for Energy from Waste Plant in Plymouth, Hagen and Bamberg

2013 - 2015

Fabrication and Installation Filter Conversion for Cement Factory and Wind Measurement Masts

Deha Tech's Fabrication and Installation Filter Conversion Cement Factory and Wind Measurement Masts Projects completed successfully.

2013 - 2015

Fabrication and Installation Filter Conversion for Cement Factory and Wind Measurement Masts

2014 - 2015

One of our most important goal is to provide our clients with a smart Ammonium Nitrate Plant.

One of our most important goal is to provide our clients with a smart Ammonium Nitrate Plant. Deha Tech completed in July 2015 as erection on Bagfas Calcium Ammonium Nitrate Plant. Deha Tech below scope our work contains erection CU100 and CU140 buildings new fertilizer plant according to international standart rules.

2014 - 2015

One of our most important goal is to provide our clients with a smart Ammonium Nitrate Plant.

2016 - 2017

Khabat Thermal Power Plant fabrication and Hamitabat field erected tank for 1200mw natural gas combined cycle power plant

Khabat 300 MW Thermal Power Plant fabrication successfully completed and delivered. Hamitabat field erected tank for 1200mw natural gas combined cycle power plant with all detail design, construction works, procurement and installation of the main and auxiliary equipment of the power plant have been completed. A new power plant with a capacity of 300 megawatts (MW) in Iraq's.

2016 - 2017

Khabat Thermal Power Plant fabrication and Hamitabat field erected tank for 1200mw natural gas combined cycle power plant

2017 - 2018

Our vision growing into the most beneficial successful and preferred energy company in target countries

Combined cycle power plant projects has begun its operations. Deha Tech erected storage tanks in 2017, Mary 3 and Turakurgan combined cycle power plant projects in Uzbekistan and Turkmenistan.

2017 - 2018

Our vision growing into the most beneficial successful and preferred energy company in target countries

2018-2019

Turning municipal waste into usable energy, Turkey's first EfW plant will also be the largest in Europe

Deha Tech manufactured and delivered main components-feed hopper, bottom ash chute, boiler non-pressure parts, grate riddlings and silos- not only for Europe’s largest EfW plant in Istanbul also EfW in France, UK, Russia and Austria.

2018-2019

Turning municipal waste into usable energy, Turkey's first EfW plant will also be the largest in Europe

2019 - 2020

Waelz facility for processing of zinc materials carried out by our professional engineers and technicians.

Waelz facility for processing of zinc materials carried out by our professional engineers and technicians has been completed. Deha Tech, EPC as a basis for Rotary Kiln in Turkey has completed the installation and commissioning process. The extractive metallurgy process has been designed according to the raw material stored.

2019 - 2020

Waelz facility for processing of zinc materials carried out by our professional engineers and technicians.

2020 - 2021

Deha Tech continues to grow worldwide.

We became the R&D and Design Center and Our first EPC Cement Plant is successfully delivered fabricated works to USA

2020 - 2021

Deha Tech continues to grow worldwide.

2021

In order to build a better future, we transformed our past experiences into worldwide services in 2021.

In order to build a better future, we transformed our past experiences into worldwide services in 2021. Deha Tech continues to provide the highest quality services worldwide at full speed, with a total of 2000 employees, 4 factories and 1 port in a 59000 sqm production area. Since our inception, we continue to serve with 4 offices in Russia, Iraq, Uzbekistan and Bulgaria.

2021

In order to build a better future, we transformed our past experiences into worldwide services in 2021.


OUR HISTORY / JOURNEY