SHIP UNLOADER PROJECT

Project Name

01

Location

ISRAEL

03

Date

2021

05

Service

EPC

02

Scope

SHIP UNLOADER

04

Duration

IN PROGRESS

12
13
14
15
1
3
4

Our new mechanical ship unloader is ready to be shipped fully assembled from the production site to its final destination.

This shipunloder will operate at a capacity of 1200 t/h and will feature a cutter able to unload free flowing as well as non free flowing (meals, DDGS) materials. Optionally, the material can be delivered to quay belt conveyor or directly loaded to trucks stacker and reclaimer taman port