A lack of electrical energy storage facilities in transmission systems leads to a key limitation. Electrical energy must be generated at the same rate at which it is consumed. A sophisticated control system is required to ensure that the power generation very closely matches the demand. The need for a high transmission voltage occurs when a large amount of power has to be transmitted over a long distance.

High voltage transmission lines deliver electricity over long distances. The high voltage is required to reduce the amount of energy lost during the distance. The primary reason that power is transmitted at high voltages is to increase efficiency. As a result, transmission towers do not need to be engineered to support the weight of heavier wires that would be associated with a high current.

We place the importance on adopting the advanced technology for use in controlling and monitoring follow-ups on the functions of the power distribution system which, in this connection, electrical voltage and efficiency on the power distributions will be reported to be aware of by the operator.

Deha Tech has the capability to assembly high voltage projects across the world. We specialize in EPC services for gas insulated substations (GIS), switchyards and substations, high voltage transmission lines.

At Deha Tech, we can provide engineering, procurement, assembly, testing and commissioning services in projects related to High Voltage Lines.

1
2
3